Cafeteria Food Safety (ANVISA RDC 216)
Food-safety routine for the school cafeteria under ANVISA RDC 216/2004: food handler health and hygiene check, receiving and storage temperature control, preparation and holding temperature logs, utensil and surface sanitization, waste segregation, supplier and product traceability, and a responsible sign-off with records ready for the health inspector. Built for operations teams, structured execution with approval gates and an audit trail.
For: Cafeteria Manager, Cafeteria Team, and Administrative Director teams running cafeteria food safety (anvisa rdc 216)
What this template includes
Process steps
- 1Food handler health and hygiene check
- 2Receiving temperature control and product inspection
- 3Storage temperature logs (fridge and freezer)
- 4Preparation and holding temperature logs
- 5Utensil and surface sanitization
- 6Waste segregation and disposal
- 7Checkpoint 1, Manager validates RDC 216 compliance
- 8Supplier and product traceability record
- 9Checkpoint 2, Administration review and archive
Why teams use this template
Food-safety routine for the school cafeteria under ANVISA RDC 216/2004: food handler health and hygiene check, receiving and storage temperature control, preparation and holding temperature logs, utensil and surface sanitization, waste segregation, supplier and product traceability, and a responsible sign-off with records ready for the health inspector. When this work runs through inboxes and ad-hoc spreadsheets, ownership gets fuzzy and evidence gets lost. Cafeteria Food Safety (ANVISA RDC 216) gives you a 9-step process with 2 checkpoints and a built-in SLA so nothing slips between handoffs.
Built for teams led by Cafeteria Manager, Cafeteria Team, and Administrative Director: every task has a named owner, every approval routes to a real role, and the run history is the audit trail your auditors actually want.
The checkpoint tasks ("Checkpoint 1, Manager validates RDC 216 compliance" and "Checkpoint 2, Administration review and archive") cannot be skipped, they're where the run produces evidence the next stage depends on. Overdue runs escalate automatically, and you start with structure instead of building it from scratch every time.
Ready to run this process?
Open this template in Cadenio, customize the fields and approvals for your context, and run it for the first time in under 60 seconds.
Related templates
Change Request Governance
Change request governance template, route engineering changes through the right approvers with 3 gates, no shortcuts, and a complete record of who approved what and when.
OperationsBusiness Continuity Test
Business continuity test template, scoped scenario, drill execution, scored outcome, after-action report, and executive briefing. Six-step BCP test with documented evidence for auditors.
OperationsProcess Change Management
Process change management template, impact assessment, stakeholder sign-off, and rollout plan tracked in one workflow so nothing falls through the cracks when a process changes.